Specialist Contractor for Sunway Construction, the Main Contractor for the Rapid Transit System (RTS Link) Project connecting Johor Bahru, Malaysia, and Singapore. The scope of works included the casting of precast segmental box girders (SBG), erection and launching using launching girders imported from Italy, and post-tensioning works. The standard spans were constructed using launching girders supported by temporary trestle systems reaching heights of up to 20 metres. The project also involved the construction of two (2) long spans, one crossing an existing historical museum and the other spanning the Malaysia–Singapore Causeway. These long spans were constructed using the Balanced Cantilever Method (BCM), incorporating segment transporters for backfeeding segments to the launching girder from the partially completed viaduct deck. The scope further included all associated construction engineering, specialised temporary works and post-tensioning works.
Client
Sunway Construction Sdn Bhd
Location
Johor Bahru, Malaysia
Year
2023
Package
Precast segmental box girders 919 nos, erection and launching