Specialist Contractor for CES_SDC Pte Ltd, the Main Contractor for the Design and Construction of Jurong Region Line Contract J107, comprising approximately 1.3 km of elevated viaduct between Tawas and Gek Poh, under the Land Transport Authority (LTA), Singapore. The scope of works included the establishment and operation of a precast casting yard, casting of precast segmental box girders (SBG), erection and launching of SBG using specialised bridge launching equipment and cranes, post-tensioning works, and all associated construction engineering and temporary works. The Long Span accross PIE Highway spanning at 90m Span was longest span in entire Juring Region Line LRT.
Client
CES_SDC Pte. Ltd.
Location
Jurong, Singapore
Year
2021
Package
Casting, launching and post tensioning of segmental box girder viaduct