Appointed as the Specialist Contractor for IJM Construction, the Main Contractor for the Klang Valley MRT Line 1 Package V5 at Cheras, Kuala Lumpur. The scope of works comprised the construction of three (3) long spans totalling approximately 0.6 km, forming part of the overall 5.4 km viaduct. The works included the casting of precast segmental box girders (SBG), erection and launching using segment lifters and cranes under the Balanced Cantilever Method (BCM), post-tensioning works, and all associated construction engineering and temporary works.
Client
IJM Construction Sdn Bhd
Location
Kuala Lumpur, Malaysia
Year
2012
Package
Casting, launching and post tensioning works of 189 nos of segmental box girders (SBG) (special spans)