Main Contractor under Sime UEP Development for the construction of a vehicular viaduct consist of 12 span connecting USJ Heights to USJ 3 across the KESAS Highway. The scope of works included foundation and substructure works, pier columns, pier crossheads, casting and launching of precast T-girders, construction of approach ramps, and all associated construction engineering and temporary works.
Client
SIME UEP Development Sdn Bhd
Location
Selangor, Malaysia
Year
2009
Package
Kesas Highway at KM36
12 span bridge (300m) dual carriageway