Construction of a 300-metre-long utility viaduct bridge across Sungai Langat, Kuala Langat, to accommodate twin 2,000 mm diameter water pipelines under the Integrated Water Supply Scheme (IWSS), as part of Gamuda’s integrated development.
Client
Master Pave Sdn Bhd
Location
Selangor, Malaysia
Year
2019
Package
Casting, launching and post tensioning works of 88 nos (SBG)