Acreworks Sdn Bhd was appointed as the Main Contractor for Work Package 3A (WP03A) under a separate contract agreement with MASB, specifically for the execution of enabling and foundation/substructure works across four main zones
Zone A: New Main Terminal Building
Zone B: Domestic Boarding Hall
Zone C: Connecting Pier
Zone D: Elevated Driveway Ramp
The scope of works includes the installation of 600 mm diameter spun piles and 400 mm × 400 mm reinforced concrete (RC) piles, comprising a total of 2,028 pile points and 609 pile caps of various sizes.
In addition, the contract encompasses high and low-voltage utility relocation works, construction of a temporary steel ramp at Zone D, soil investigation, site clearing, and other associated enabling works required to facilitate the subsequent building construction works.
Client
Malaysia Airports Sdn Bhd
Location
Penang, Malaysia
Year
2026
Package
Enabling and Sub-Structure works