Main Contractor under Turnpike (a subsidiary of Prolintas) for the design and construction of a section of the Damansara–Shah Alam Elevated Expressway (DASH), incorporating alternative designs for the mainline highway and interchange ramps. The scope of works involved complex viaduct structures comprising large-diameter single bored pile foundations, pier columns reaching heights of up to 25 metres, precast segmental crossheads, and precast U-girders and T-girders for the mainline and ramps. A key engineering highlight was the construction of cast-in-situ balanced cantilever spans using the Form Traveller Method across Persiaran Surian, involving complex multi-level viaduct structures and interfaces with the existing MRT Line 1 alignment.
The project also included associated construction engineering, temporary works and coordination of complex structural interfaces.
Client
Turnpike Synergy Sdn Bhd
Location
Selangor, Malaysia
Year
2016
Package
Expressway
Elevated highway
4.2 KM total length