Main Contractor under PKNS Selangor for the reconstruction of the cloverleaf interchange ramps and collapsed mainline bridge at Lingkaran Putrajaya. The scope of works included foundation and substructure works, pier columns, pier crossheads, casting and erection of precast segments using segment lifters, post-tensioning works and associated temporary works. A key feature of the project was the integration of large-diameter water pipelines along the shoulders of the dual-carriageway viaduct in both directions, accommodating both vehicular traffic and utility infrastructure within the same bridge structure.
Client
Perbadanan Kemajuan Negeri Selangor
Location
Selangor, Malaysia
Year
2015
Package
Bridge
Selangor